Open main menu

Changes

2,495 bytes added ,  17:11, 7 March 2021
no edit summary
Insert lots of pictures##Foundation
##Foundation[[File:OctogonPosts.jpg|Digging Post Holes and Tamping in Posts|thumb]]
The octagon cabin rests on nine main posts and two extra for the bump out. The posts are mainly locust trees that were felled on the land. The center post is a power line post taken down from when Lisa and Elizabeth went off-grid. The post holes were dug to go below the frost line so that they wouldn't rise out of the ground when it freezes during the winter. The posts were then debarked and put in the ground. To make them stable we tamped dirt and rocks into the hole slowly with sticks.
<gallery class="center" mode=packed heights=150px>
File:HandDrawnTrianglePlan.JPG|Initial Plan for the Triangular Floor Joists
File:OctogonFloorJoistAbove.jpg|Compleated Completed Joist System
File:UncutSubfloor.JPG|Nailed Subfloor Boards
File:CuttingSubflooring.jpg|Cutting Subflooring Perimeter with Circular Saw
When we designed the wall frames, we started by inventorying the windows we had and figuring out where they would work best to maximize southern sunlight. Beyond that, we followed rules about headers and stud placement. To make the wall frames, we cut 2x6 boards on the chop saw and assembled them with screws.
<gallery class="center" mode=packed heights=400px150px>
File:NorthWallPlan.jpg|North Wall
File:NorthWestWallPlan.jpeg|North-West Northwest Wall
File:WestWallPlan.jpeg|West Wall
File:SouthWestWallPlan.jpg|South-West Southwest Wall
File:SouthWallPlan.jpg|South Wall
File:SouthEastWallPlan.jpg|South-East Southeast Wall
File:EastWallPlan.jpg|East Wall
File:NorthEastWallPlan.jpeg|North East Northeast Wall
</gallery>
<gallery class="center" mode=packed heights=350px150px>
File:NorthWallPicture.jpg|North Wall
File:NorthWestWallPicture.jpg|North-West Northwest Wall
File:WestWallPicture.jpg|West Wall
File:SouthWestWallPicture.jpg|South-West Southwest Wall
File:SouthWallPicture.jpg|South Wall
File:SouthEastWallPicture.jpg|South-East Southeast Wall
File:EastWallPicture.jpg|East Wall
File:NorthEastWallPicture.jpg|North East Northeast Wall</gallery> Progress Photos: <gallery class="center" mode=packed heights=150px>File:BeginingFraming.jpg|Beginning FramingFile:WorkingOnWall.jpg|Assembling FrameFile:NailingFrame.jpg|Nailing Frame TogetherFile:RaisingWall.JPG|Raising the Last Wall FrameFile:OctogonFraming.jpg|Framed Octagon
</gallery>
##Insulation
The octagon insulation is made up of sections of light straw clay and bottle walls. Both required a multi-step process. For the light straw clay, we sifted clay harvested on the land, mixed it with water to make a clay slip, then tossed it with local straw and packed it into the walls. We tried stomping at first, then pushed it in with our hands, then started just pushing the edges of each section down with sticks to keep the centerless center less packed. For every two feet we went up we put in a piece of wire to give it support. For the bottle walls, we cut four inches off the bottom of wine bottles and then taped two pieces together to make an 8-inch long section to put into the 5.5-inch thick walls. [insert rest of bottle The taped-together bottles were packed into the wall process]with cobb between them. <gallery class="center" mode=packed heights=150px>File:MixingLSC.jpg|Mixing Light Straw ClayFile:NightPackingLSC.jpg|Packing Light Straw Clay at NightFile:PackingLSC.jpg|Packed Light Straw ClayFile:InsulationCloseUp.jpg|Packed Light Straw Clay Up Close</gallery>
##Roofing
The roof system is built out of 2x6 rough cut rafters, suspended between a ridge beam and two beams mounted on the top of the north and south walls. The ridge beam is made from two 12' 4x12s combined with a half lap joint. The beam is supported under the joint and on the east and west sides by 12' poplar posts which were cut down to clear the site. 45-degree poplar sections connect the beam to the posts and provide extra support. The north and south beams are 14' 4x6s bolted to the north and south walls on top of the double top plate. The rafters angled towards each other to create a skinnier roof on the north and south sides than in the center.
The ceiling was built out of the same rough-cut boards as the subflooring and nailed to the rafters. We tacked roofing paper to the ceiling then covered the roof in overlapping corrugated metal roofing. We cut the edges of the roofing with an angle grinder.
##Loft Construction<gallery class="center" mode=packed heights=150px>File:RidgeBeam.jpg|Installing Ridge BeamFile:InstallingNorthBeam.jpg|Bolting North BeamFile:InstallingRafters.jpg|Attaching RaftersFile:NailingCeilingBoards.jpg|Completed RaftersFile:SlantedRafters.jpg|Angled Rafters from Ridge to North BeamFile:CeilingBoardsOn.jpg|Roof with Ceiling BoardsFile:CuttingCeiling.jpg|Cutting Ceiling BoardsFile:RoofPreTrim.jpg|Nailing on Corrugated RoofingFile:CaulkingRoof.jpg|Caulking Holes in RoofingFile:CompleatedRoof.jpg|Completed Roof</gallery>
##Installing Windows
We nailed and screwed the pre-cased windows into the holes for them in the wall frames. For some windows, we built frames and attached them to the outside of the windows so the window could be attached to the wall.
##Loft Construction
The loft is supported by the east wall, the southeast wall, and the center poplar post. It is built with 2x6 girders and 2x3 joists.
<gallery class="center" mode=packed heights=150px>
File:Loft.jpg|Finished Loft
File:LoftBottom.jpg|Structure of the Loft
</gallery>
##Future Steps
 As of 12/16/2021 , the octagon was Tyvecked Tyveked to be waterproofed waterproof for the winter. In the spring or future, the octagon will need plaster on the walls to protect the light straw clay insulation. In addition to the plaster, a few other projects have to be completed to fill gaps in the walls. One window still needs to be framed and installed in the top of the Southsoutheast wall, and a front door needs to be installed. The sections left open for bottle walls need to be completed or filled with light straw clay. A bump-out needs to be constructed or something needs to be installed to cover the hole to it to leave it as a deck, and the section above the bump-East wallout, between the northeast Wall and the roof, needs to be covered with boards. To complete the roof, a hole needs to be cut for a chimney pipe from the woodstove. It would also be good to add some kind of waterproofing or filler between the ridge cap and the roofing to prevent water from being blown upward and leaking through the and ridgeline of the roof. AdditionallyFor the stability of the building, 2x6s need to be added to the outside of the floor joist triangles and . Finally, flashing needs to should be added over the outside of the rim boards to the bottom of the walls.<gallery class="center" mode=packed heights=150px>File:FrontOctogon.jpg|Front of the OctagonFile:BackOctogon.jpg|Back of the OctagonFile:RightOctogon.jpg|Side of the Octagon</gallery>
77

edits