__22__ - cut octagon sub-flooring and filled in crones sub-flooring. Had a celebration for the equinox.
__23__ - Put up 3 walls of the octogenarian and cut crones sub-flooringsflooring. Fixed the microhydro micro hydro turbine- current was running backwards. Started wall frames for the octagon.
__24__ - planned out sub flooring for treehouse Andy tree house and measured boards to cut. __25__ -  __26__  __27__ - finished fourth wall of octagon. __28__ __29__  __30__ - first crones wall frame went up.
## Oct
 
__01__ - giant branch fell on the art studio.
 
__02__ - 6 walls up for octagon.
__03__ decided to move into the sun with tiny cabin.
__04__ - decided to go without chore chart besides cooking and AM animals; cleared out new place for tiny cabin, cut down trees.
__05__ - wall frames on octagon finished.
 
__06__
 
__07__
 
__08__ - started light stray clay on the octagon just in time for the hurricane.
 
__09__
 
__10__
 
__11__
__12__ - broke second ground on tiny house and finished six post holes. Three crones wall frames are up
 
__13__ - cut posts for the tiny house and octagon bump out. Dug post holes for octagon and art studio bump outs.
 
__14__ - cut 60 bottles for walls. Light straw clayed until 10:30 pm to finish a big wall.
 
__15__ - started electrical wiring on the octagon.
 
__16__ - fourth crones wall went up.
 
__17__
 
__18__
 
__19__ - put up beams on the octagon. tamped the octagon bump out posts. took down a giant dead tree that was going to come down on the art studio.
 
__20__ - light straw clayed another wall and a bit more on the octagon. cleaned off solar panels which tripled our output.